Richard Li

Richard Li

Assoc Professor

Baldwin Hall

765E

CEAS - Civil Eng - 0071

Research Support

Grant: #22-0807C-01 / PON2-605-2200002513 Investigators:Li, Zhixia 10-21-2022 -10-20-2023 Kentucky Transportation Cabinet Vehicle Trajectory-Based Evaluation of Stop Sign Spacings Impact on Reducing Vehicle Speed using Radar Sensing Technology Role:PI 60000.00 Hold Level:Other

Grant: #pending Investigators:AHMED, MOHAMED; Ash, John; Li, Zhixia; Wei, Heng 02-21-2023 -02-20-2028 Department of Transportation Transportation Cybersecurity Center for Advanced Research and Education (CYBER-CARE) Role:PI 300000.00 Hold Level:Federal

Grant: #pending Task 1 ROC / 39174 Investigators:Li, Richard 01-31-2024 -08-31-2024 Federal Highway Administration Synthesis Study on Methods for Collection of Traffic Data Role:PI 50000.00 Hold Level:Federal

Grant: #AMS-700-02-FM-04016 / EPA Task Order #68HERC23F0523 Investigators:Li, Richard; Wei, Heng 04-01-2024 -03-31-2025 Environmental Protection Agency Water-Energy Optimization System Development - Task 2 Testing and development of SUD modules Role:Collaborator 70000.00 Hold Level:Federal

Grant: #OS210410 / 68HERC-19-D-0009 Investigators:Li, Richard; Wei, Heng 05-29-2024 -09-30-2024 Environmental Protection Agency Water-Energy Optimization System Development - Task 2 Testing and development of SUD modules Role:Collaborator 70000.00 Hold Level:Federal

Grant: #ULRF_25-0046G-01 Investigators:Li, Richard 07-01-2024 -10-31-2024 Kentucky Transportation Cabinet Vehicle Trajectory-Based Evaluation of Stop Sign Spacings Impact on Reducing Vehicle Speed using Radar Sensing Technology PHASE 3 Role:PI 0.00 Hold Level:Other

Grant: #pending Investigators:Banawi, Aziz; Elzarka, Hazem; Kunapareddi, Vineela; Li, Richard; Said, Hazem 07-01-2024 -06-30-2028 Department of Transportation Accelerating Advanced Digital Construction Management Systems Role:Collaborator 5092990.00 Hold Level:Federal